Summary: Separate the AC bus from the DC system, identify the PCS and MPPT roles, and define how batteries, utility and generator connect before selecting a combination.

400 V microgrid design notes · 1/10

A 400 V microgrid gives the PCS, PV controller and battery different jobs. Follow the power path before choosing the combination: where PV enters, where the battery connects and what maintains the AC bus after an outage.

Concept illustration for this topic, not an actual project, equipment wiring diagram or approved system configuration.

Identify what 400 V describes

Here, 400 V means the designed three-phase AC line-to-line voltage, not PV-string or battery-bus voltage. Check phases, frequency, neutral distribution and earthing for each circuit. Matching a voltage label does not establish equipment compatibility.

Separate the PCS and PV-controller tasks

LEONA-H135K provides the storage PCS role; LEONA-M200K is a PV MPPT DC/DC controller. Its 200 kW is not 200 kW of AC inverter output. The battery, controller and PCS must also agree on operating voltage, current limits, control authority and protection.

Recognize the integrated alternative

Formal LEONA-B750K documentation describes an integrated cabinet with an isolation transformer. Compared with a wall-mounted split arrangement, its differences include installation boundaries and interfaces, not just capacity. Do not assume all switches, PV inputs or battery accessories are included.

Complete the single-line diagram

Mark the connection point, essential and ordinary loads, battery branches, meters and source selection. If an ATS selects utility or generator, do not depict them as permanently paralleled. Parallel operation requires separate confirmation of synchronization, power sharing and protection.

Deliver operating cases as well as a drawing

Specify control during high PV output, night operation, low-SOC generator requests, utility restoration and communication failure. Match these cases to supplied equipment and interface versions. A workable combination requires those conditions to close, not merely arrows between product pictures.

Related VGRID product documentation

Submit a project assessment for engineering review of actual conditions

Continue this series

References

Model descriptions follow the cited revisions; examples use the stated assumptions. Final configuration and test conditions need project confirmation. Site functions have not been independently verified here.

FAQ

Does 400 V in a microgrid mean AC line voltage or battery voltage?

Here, 400 V means the designed three-phase AC line-to-line voltage, not PV-string or battery-bus voltage. Check phases, frequency, neutral distribution and earthing for each circuit. Matching a voltage label does not establish equipment compatibility.

Does LEONA-M200K's 200 kW count as AC inverter output?

LEONA-H135K provides the storage PCS role; LEONA-M200K is a PV MPPT DC/DC controller. Its 200 kW is not 200 kW of AC inverter output. The battery, controller and PCS must also agree on operating voltage, current limits, control authority and protection.

Can utility and generator power simply be added?

Mark the connection point, essential and ordinary loads, battery branches, meters and source selection. If an ATS selects utility or generator, do not depict them as permanently paralleled. Parallel operation requires separate confirmation of synchronization, power sharing and protection.