A module datasheet puts its wattage front and centre. Dividing 200 kW by 550 W gives a quantity, but it does not tell you how many modules to wire in series or how many strings an MPPT can accept. Two 550 W modules can have different voltages, currents and temperature coefficients. Those differences matter when the array is connected.
Read the electrical ratings first
Pmax, or Pmp, is power at the maximum power point under specified test conditions. Vmp and Imp are the voltage and current at that point. Voc is open-circuit voltage; Isc is short-circuit current. Use Voc for cold-weather voltage checks and Isc for the relevant short-circuit and protection calculations. Imp cannot replace Isc.
STC ratings use 1000 W/m² irradiance, 25°C cell temperature and AM1.5. Cell temperature is not ambient temperature: mounting and ventilation affect how hot a sunlit module gets. NMOT data helps put operating conditions in context. Nameplate watts are not an all-day output promise.
Read the separate temperature coefficients for power, Voc and Vmp. A missing Vmp coefficient must come from the module manufacturer or an applicable model; do not substitute the power or Voc coefficient. The module's maximum system voltage does not override the controller or connector limit. Its maximum series-fuse rating is neither normal operating current nor an allowable number of parallel strings.
Where the LEONA-M200K fits
The LEONA-M200K is a step-up/step-down PV MPPT DC/DC controller. It feeds a project-designed DC system. A compatible PCS supplies AC loads; the battery, PCS, bus voltage, protection and controls must be checked together.
The V1.5 specification dated 2026-10-15, physical page 7, lists:
| Parameter | Published value |
|---|---|
| Rated PV power | 200 kW |
| PV open-circuit voltage range | 200–1100 V |
| MPPT operating range / start voltage | 200–950 V / 250 V |
| PV inputs / MPPT trackers | 16 / 8 |
| Maximum PV branch current | 18 A ×16 |
| MPPT current / short-circuit current | 36 A ×8 / 39.6 A ×8 |
| High-voltage side: range / rated voltage / maximum current | 0–950 V / 700 V / 288 A |
The 1100 V open-circuit boundary is not a normal tracking voltage. Being within the MPPT range does not guarantee 200 kW throughout that range. Sixteen PV inputs also do not mean sixteen independent trackers; confirm terminal assignments in the supply wiring documents.
Set string length using cold voltage
For many crystalline-silicon modules, Voc rises as temperature falls. A first-pass linear calculation is:
Voc(cold) ≈ Voc(STC) × [1 + βVoc × (design low temperature − 25°C)]
Use a signed decimal coefficient: −0.25%/°C becomes −0.0025/°C. Multiply by the series module count, then check the strictest voltage limit in the circuit, module tolerances and required design margin. Also calculate hot and cold Vmp and check startup separately. The site design temperatures must follow an appropriate manufacturer-supported method.
An illustrative 550 W calculation
These are hypothetical teaching inputs, not a real module selection or construction design. Assume Pmax 550 W, Vmp 41.8 V, Imp approximately 13.16 A, Voc 49.8 V and Isc 14 A. Assume Voc and Vmp coefficients of −0.25%/°C and −0.30%/°C, a cold design temperature of −10°C and hot cell temperature of 70°C.
| 18 modules in series | Calculated result |
|---|---|
| STC Vmp | 752.4 V |
| Cold Voc at −10°C | 974.8 V |
| Hot Vmp at 70°C | 650.8 V |
| Cold Vmp at −10°C | 831.4 V |
These assumed voltages pass an initial range check. Low irradiance, tolerances, startup and the actual site conditions still need checking. Eighteen modules is an example, not a universal string length for 550 W modules.
Check operating and short-circuit currents separately
If the supplied wiring documentation confirms two strings per MPPT, each on its own branch, one string has about 13.16 A operating current at STC and two have 26.32 A. Compare these with the 18 A branch and 36 A MPPT boundaries. The combined STC Isc is 28 A; apply the project corrections for irradiance, bifacial contribution, temperature and applicable design rules before comparing with 39.6 A per MPPT. Do not treat half of 39.6 A as a confirmed branch short-circuit rating.
Series wiring adds voltage; parallel wiring adds current. Check module type, series count, orientation, tilt and shading for strings sharing a tracker. Group differently oriented or shaded areas using the actual MPPT assignments. This article does not prescribe PV1–PV16 terminal pairings.
Array capacity is only part of the microgrid design
Sixteen strings of eighteen modules give 288 modules and 158.4 kWp. Under the two-string assumption, each MPPT has 19.8 kWp connected. Adding modules just to reach 200 kWp can break a voltage limit. The controller's 200 kW rating does not establish an unrestricted oversizing allowance, and array kWp is not continuous output kW or daily energy kWh.
Use the load profile, daily energy demand, charging window and poor-weather supply strategy to size the array. Check PV and DC-bus voltages, derating, battery charge acceptance and PCS capacity. Define how power will be limited when storage is full or load falls suddenly. Some curve labels in V1.5 need reconciliation with the parameter table; this article does not use them to promise a full-power region or operation beyond the table limits.
Before approving wiring, collect the exact module datasheet and tolerances, site temperature and irradiance inputs, bifacial assumptions, string/MPPT schedule, controller input mapping and per-channel power/oversizing conditions. Complete the BMS/EMS, cable, connector, isolation, fuse and grounding checks with the project designer.
References
- LEONA-M200K V1.5, 2026-10-15, original Chinese PDF: physical page 7 ratings, pages 8–9 curves, pages 10–11 ports.
- Canadian Solar module installation manual, English 3.1: module ratings, cold-voltage correction and protection. No particular module is endorsed here.
- SMA PV-input requirements: general string-consistency and cold-voltage checks; SMA equipment ratings are not applied to M200K.
FAQ
How many solar panels does a 200 kW MPPT need, and can panel count be calculated from wattage alone?
It estimates nameplate capacity only, not wiring. Check cold Voc, hot/cold Vmp, startup, branch and MPPT currents, corrected short-circuit current and the receiving DC bus, battery and PCS.
What do solar-panel Voc, Vmp, Imp and Isc mean, and which matter for string sizing?
Voc checks open-circuit voltage, especially its cold limit; Vmp checks the tracking range; Imp checks operating current; Isc supports short-circuit and protection checks. Use the relevant temperature coefficients and corrections rather than substituting them.
Can every 550 W module use 18 modules per string?
No. The article’s 18-module string depends on assumed module data, coefficients and design temperatures. It is a teaching example. Recalculate using the actual model, tolerances, hot/cold conditions and equipment limits.
Do 16 PV inputs mean 16 independent MPPT trackers?
No. The M200K V1.5 data cited lists 16 PV inputs and 8 MPPT trackers. Confirm terminal allocation, permitted strings per tracker and wiring against the supplied documentation.
Does 28 A STC short-circuit current passing below 39.6 A complete the check?
No. The example’s 28 A is an STC screen; apply project corrections for irradiance, bifacial gain and temperature. The cited 39.6 A is a per-MPPT limit, not a confirmed individual branch limit obtained by dividing by two.
Is the 158.4 kWp example ready to install or extend to 200 kWp?
No. It assumes 16 strings of 18 modules rated 550 W. Oversizing permission, terminal allocation, protection, derating curves, DC bus and controls still need confirmation. Do not add series modules merely to reach a power target.