Summary: Define generator requests and charging from load, SOC, PV changes and generator limits. Validate fuel savings from records rather than a fixed percentage.

400 V microgrid design notes · 4/10

Generator requests and charging power need to follow load and battery conditions. Define those operating cases first, then use comparable records to see whether storage reduced starts and fuel consumption.

Concept illustration for this topic, not an actual project, equipment wiring diagram or approved system configuration.

Define the generator’s role

Prime supply, backup and emergency duty have different requirements and ratings. Confirm the intended H135K or B750K operating arrangement. ATS source selection and approved parallel cooperation must not use the same assumptions.

Use more than one SOC trigger

Consider expected load, available battery power, PV uncertainty, generator preparation time and backup needs. SOC alone may start the generator too late for a load step or cause repeated starts during short fluctuations. Validate project thresholds.

Loads and charging both consume generator capacity

Teaching case: site-allowed continuous active power is 160 kW, current load 100 kW and proposed AC-side charging input 30 kW. The active-power screen is 130 kW. The remaining difference is not automatically available for more charging: check kVA, transients, environment and control reserve.

Do not send surplus PV into an unapproved generator sink

When load falls or sunshine rises, identify who curtails PV, reduces charging requests or adjusts other power. Obtain reverse-power, minimum-load and run-time requirements from the actual generator. Do not assume a universal percentage or that the battery can always absorb surplus.

Measure the fuel result

Record load, PV, SOC, battery power, generator starts and measured fuel, with a comparable baseline. Match VGRID roles and strategies to the supplied revision. No fuel-saving rate, payback or service commitment is established here.

Related VGRID product documentation

Submit a project assessment for engineering review of actual conditions

Continue this series

References

Model descriptions follow the cited revisions; examples use the stated assumptions. Final configuration and test conditions need project confirmation. Site functions have not been independently verified here.

FAQ

What is the difference between ATS transfer and generator paralleling in a solar-storage-diesel microgrid?

They are different: an ATS selects a source, while generator paralleling needs separately approved synchronization, load sharing and protection. Prime supply, backup and emergency duty have different requirements and ratings. Confirm the intended H135K or B750K operating arrangement. ATS source selection and approved parallel cooperation must not use the same assumptions.

Is generator rated power minus load the available battery-charging power?

Teaching case: site-allowed continuous active power is 160 kW, current load 100 kW and proposed AC-side charging input 30 kW. The active-power screen is 130 kW. The remaining difference is not automatically available for more charging: check kVA, transients, environment and control reserve.

Can battery installation alone justify a promised fuel-saving percentage?

Record load, PV, SOC, battery power, generator starts and measured fuel, with a comparable baseline. Match VGRID roles and strategies to the supplied revision. No fuel-saving rate, payback or service commitment is established here.