Utility or generator: accepting an ATS interface in a 400 V microgrid
Summary: Separate source selection, PCS control and load ride-through. Check interlocks, feedback and abnormal states for H135K or B750K projects.
400 V microgrid design notes · 5/10
An ATS selecting utility or generator needs clear answers: which source is requested, where the switch actually sits and what happens after a fault. Check the drawings against the position feedback.
Concept illustration for this topic, not an actual project, equipment wiring diagram or approved system configuration.
Distinguish selection from paralleling
A mutually exclusive design needs confirmed transfer logic, interlocking and position feedback. It is not permanent source paralleling. Illustrations and timing examples are communication aids, not approved control logic for a particular ATS.
Allocate cabinet and external responsibilities
Functional descriptions of H135K or B750K do not automatically include every external source interface or switch in the order. Check diagrams, terminal schedules, control supply, position signals and alarm recipients. Record the supply boundary.
A millisecond figure is not a system-wide continuity guarantee
PCS response, transfer hardware, controls and load hold-up are separate elements. Even when a document gives a switching figure, establish its test conditions, device combination and load. Critical loads may need a separate solution.
Include abnormal conditions
Qualified teams should use an approved plan to examine inconsistent feedback, failed operation, abnormal source voltage, lost control power and recovery. Neutral and earthing transfer requirements depend on architecture. This article gives no universal connection or temporary bridging remedy.
Keep a traceable transfer record
Record source, load, voltage/frequency, sequence, protection and recovery against agreed criteria. The home-page animation illustrates exclusivity; its display delay is not ATS performance or an acceptance report.
Related VGRID product documentation
Submit a project assessment for engineering review of actual conditions
Continue this series
- Operating a 400 V solar–storage–diesel microgrid with VGRID PCS
- Rebuilding a 400 V bus after an outage: VGRID PCS black-start conditions
References
Model descriptions follow the cited revisions; examples use the stated assumptions. Final configuration and test conditions need project confirmation. Site functions have not been independently verified here.
FAQ
Can an ATS make the utility grid and diesel generator supply power at the same time?
Not in the mutually exclusive design discussed here: transfer does not mean paralleling the two sources. A mutually exclusive design needs confirmed transfer logic, interlocking and position feedback. It is not permanent source paralleling. Illustrations and timing examples are communication aids, not approved control logic for a particular ATS.
Does a fast ATS or PCS transfer time guarantee uninterrupted system power?
PCS response, transfer hardware, controls and load hold-up are separate elements. Even when a document gives a switching figure, establish its test conditions, device combination and load. Critical loads may need a separate solution.
Can the home-page transfer animation prove hardware performance?
Record source, load, voltage/frequency, sequence, protection and recovery against agreed criteria. The home-page animation illustrates exclusivity; its display delay is not ATS performance or an acceptance report.