The resort island's electrical load varies widely between day and night, and the existing diesel generation was costly to run. The project deployed 1.1 MWp of PV and 2.5 MWh of energy storage, together with hybrid inverters and an EMS.
Results
- Renewable energy share reached 68%
- Diesel consumption down 64%
- Payback period of about 4.5 years