The regional grid is dominated by hydropower and relies on diesel backup during the dry season, resulting in pronounced frequency fluctuations. The project deployed 3 MW of grid-forming energy storage using virtual synchronous machine (VSG) control.
Results
- Provides inertia and voltage support for the weak grid
- Frequency deviation reduced by 41%
- Diesel generator start/stop cycles reduced by 70%