<!-- Generated for AI assistants. Canonical HTML: https://www.vgridpower.cn/en -->

# Who authorizes return to service? Make the handover traceable

“Fixed” is not a handover. The next shift needs the changes, evidence and unresolved restrictions.

Generated illustrative scene, not a real project photograph or a wiring demonstration.

Record scope, equipment IDs, drawing and software revisions, replaced parts and open items. Settings need approval and before/after values; “restored defaults” is not an adequate record. Transfer locks and isolation responsibility under site rules, never by casually removing another person’s lock.

Authorized personnel check people, tools, guards, earthing and isolation state before approved tests. Document test conditions, observations and stop criteria. One successful no-load run does not verify loaded operation; unperformed tests remain unperformed.

For VGRID, include PCS, MPPT, BMS and EMS versions and limits. Name the approver, operator, observer and escalation path. Keep original logs; a return-to-service date must not replace original equipment or document dates.

This article supports preparation and record-keeping, not local rules, switching instructions or the matching equipment manual. Opening, measurement, testing and switching are for authorized qualified personnel following site procedures.

Related reading

[ms, s, min and h: transfer, overload and backup duration](/en/blog/time-units-ms-seconds-hours)

References (check scope against local requirements)

[OSHA 1910.333](https://www.osha.gov/laws-regs/regulations/standardnumber/1910/1910.333)

## Does clearing alarms complete acceptance?

No. Approved restoration conditions and a record of people, conditions, results and open issues are still required.
