# Split or integrated at 400 V: comparing H135K plus M200K with B750K

Compare interfaces, supply boundaries, site work and maintenance rather than treating different capacity products as direct replacements.

400 V microgrid design notes · 10/10

Compare split equipment and an integrated cabinet against the required capacity and a complete supply list. Wiring, distribution, installation and maintenance responsibilities determine how the proposal can be delivered.

Concept illustration for this topic, not an actual project, equipment wiring diagram or approved system configuration.

Begin with the capacity difference

H135K V1.0 lists 135 kVA; B750K V1.4 lists 750 kVA. They are not direct substitutes. M200K handles PV-side MPPT. Establish capacity and topology from confirmed loads and starting conditions before comparing alternatives; nameplate addition is insufficient.

Assign integration work in the split design

H135K and M200K have distinct roles, but battery, bus, switchgear, protection, communications and site wiring still need complete responsibilities and design. Wall mounting does not remove switchboard or isolation needs, nor make one drawing suitable for all batteries.

Audit what is outside the integrated cabinet

B750K documentation describes a cabinet with an isolation transformer. Confirm optional PV MPPT, external supplies, cables, foundations, handling, ventilation and battery interfaces. Integrated equipment does not automatically define a turnkey station scope.

Qualify expansion and maintenance assumptions

Parallel compatibility, unit count, control revision, wiring and protection need project confirmation. A theoretical count multiplied by rating is not an approved system. Review outage boundaries, spares and qualified maintenance without inventing delivery, warranty or response commitments.

Compare complete deliverables

Review capacity assessment, single-line diagram, bill of equipment, supply boundaries, interfaces, site conditions and acceptance together. Submit requirements through the VGRID assessment form for engineering review; this article replaces neither formal design nor quotation.

Related VGRID product documentation

[LEONA-H135K](/en/product/leona-h135k)

[LEONA-M200K](/en/product/leona-m200k)

[LEONA-B750K](/en/product/sp750h54pstd-2)

[Submit a project assessment for engineering review of actual conditions](/en/blog/category/guides#assessment-form)

Continue this series

[Where surplus PV goes: M200K curtailment in a 400 V microgrid](/en/blog/400v-m200k-surplus-pv-curtailment)

References

Model descriptions follow the cited revisions; examples use the stated assumptions. Final configuration and test conditions need project confirmation. Site functions have not been independently verified here.

[LEONA-H135K · V1.0 · 2026-10-15 · PDF p.7](/uploads/2026/11/verified-specs/LEONA-H135K-spec-V1.0-20261015.pdf)

[LEONA-M200K · V1.5 · 2026-10-15 · PDF p.7](/uploads/2026/11/verified-specs/LEONA-M200K-spec-V1.5-20261015.pdf)

[LEONA-B750K · V1.4 · 2026-10-14 · PDF pp.6–7](/uploads/2026/11/verified-specs/LEONA-B750K-spec-V1.4-20261014.pdf)

## How should H135K and B750K be compared, and can they be swapped based on inverter power alone?

H135K V1.0 lists 135 kVA; B750K V1.4 lists 750 kVA. They are not direct substitutes. M200K handles PV-side MPPT. Establish capacity and topology from confirmed loads and starting conditions before comparing alternatives; nameplate addition is insufficient.

## Does a wall-mounted split system still need switchgear, protection and isolation design?

H135K and M200K have distinct roles, but battery, bus, switchgear, protection, communications and site wiring still need complete responsibilities and design. Wall mounting does not remove switchboard or isolation needs, nor make one drawing suitable for all batteries.

## Does an integrated cabinet include all station equipment automatically?

B750K documentation describes a cabinet with an isolation transformer. Confirm optional PV MPPT, external supplies, cables, foundations, handling, ventilation and battery interfaces. Integrated equipment does not automatically define a turnkey station scope.