# Export limitation on a 400 V microgrid: metering and VGRID PCS control

Locate the control boundary and verify CT direction, power signs and actuators before accepting export limitation during disturbances.

400 V microgrid design notes · 7/10

Start an export-limitation investigation at the meter: its position, the branches it sees and its import/export signs. Power commands are difficult to diagnose with an unclear measurement boundary.

Concept illustration for this topic, not an actual project, equipment wiring diagram or approved system configuration.

Measure the flow that the controller is meant to limit

Mark the connection point, PV, storage, generator and all relevant loads on the single-line diagram. A branch meter may not see exports elsewhere. Multiple entrances need explicit export boundaries rather than an assumed single total.

Align CTs and power conventions

Phase order, CT polarity, ratio and import/export signs must follow meter and control documentation. Qualified personnel should validate them through approved tests, not guessed signs or arbitrary rewiring. Display arrows should match the metering definition.

Identify the actual control action

B750K documentation lists an EMS export-limitation function; the project still needs compatible meters, controller revision and actuators. In an H135K/M200K arrangement, reducing PCS discharge and curtailing PV are different actions. Interface names do not establish arbitrary command support.

Test more than a steady screenshot

Load rejection, rising PV, a full battery and communication failure reveal control behavior. Permitted temporary export and observation windows depend on connection requirements and project agreement. This article does not promise zero export under every condition.

Preserve an event record

Log entrance and source power, SOC, commands, limits and timestamps at a useful sampling rate. Verify measurement and communication before diagnosing control. Do not change protection thresholds outside the approved process.

Related VGRID product documentation

[LEONA-B750K](/en/product/sp750h54pstd-2)

[LEONA-H135K](/en/product/leona-h135k)

[LEONA-M200K](/en/product/leona-m200k)

[Submit a project assessment for engineering review of actual conditions](/en/blog/category/guides#assessment-form)

Continue this series

[Rebuilding a 400 V bus after an outage: VGRID PCS black-start conditions](/en/blog/400v-pcs-black-start-readiness)

[Communication acceptance for 400 V microgrids: PCS, MPPT, BMS and EMS](/en/blog/400v-pcs-mppt-bms-ems-communication)

References

Model descriptions follow the cited revisions; examples use the stated assumptions. Final configuration and test conditions need project confirmation. Site functions have not been independently verified here.

[LEONA-B750K · V1.4 · 2026-10-14 · PDF pp.6–7](/uploads/2026/11/verified-specs/LEONA-B750K-spec-V1.4-20261014.pdf)

[LEONA-H135K · V1.0 · 2026-10-15 · PDF p.7](/uploads/2026/11/verified-specs/LEONA-H135K-spec-V1.0-20261015.pdf)

[LEONA-M200K · V1.5 · 2026-10-15 · PDF p.7](/uploads/2026/11/verified-specs/LEONA-M200K-spec-V1.5-20261015.pdf)

[Schneider Electric — Calculation rules when integrating solar and storage](https://www.electrical-installation.org/enwiki/Calculation_rules_when_integrating_solar_and_storage)

## Where should a zero-export meter be installed, and can a storage-branch meter represent the grid connection point?

Mark the connection point, PV, storage, generator and all relevant loads on the single-line diagram. A branch meter may not see exports elsewhere. Multiple entrances need explicit export boundaries rather than an assumed single total.

## Why must the meter and control protocol still be checked if the PCS supports zero export?

B750K documentation lists an EMS export-limitation function; the project still needs compatible meters, controller revision and actuators. In an H135K/M200K arrangement, reducing PCS discharge and curtailing PV are different actions. Interface names do not establish arbitrary command support.

## Does zero export at steady state complete acceptance?

Load rejection, rising PV, a full battery and communication failure reveal control behavior. Permitted temporary export and observation windows depend on connection requirements and project agreement. This article does not promise zero export under every condition.