# Where surplus PV goes: M200K curtailment in a 400 V microgrid

Balance load, permitted battery charging and external export before accepting full-battery or sudden-load-rejection behavior.

400 V microgrid design notes · 9/10

PV output needs to fall when charging becomes restricted and load drops. Decide the permitted destinations and the devices requesting and executing curtailment during design.

Concept illustration for this topic, not an actual project, equipment wiring diagram or approved system configuration.

List the permitted power destinations

Local loads, battery charging and approved utility export are separate outlets. Teaching assumptions: 100 kW available PV, 30 kW load and 20 kW allowed battery charging, ignoring losses. About 50 kW must be curtailed or received by another approved destination.

Define separate M200K and PCS actions

M200K’s PV-side MPPT role does not require unlimited maximum-power extraction at all times. Confirm who requests curtailment, the supported method, response conditions and lost-link strategy. An AC PCS limit alone does not prove successful PV-side limitation.

Use actual BMS charging permission

Near a boundary or abnormal temperature, the battery may reduce allowed charging current. SOC below 100% does not establish full-rate absorption. Check real-time limits, DC-bus state and measured power rather than SOC alone.

Do not assume the generator absorbs surplus

A generator without approved regenerative capability is not a default PV sink. Coordinate export limitation, PV curtailment, generator loading and charging permission. Other absorption equipment also needs project design and is not assumed here.

Include rejection and recovery tests

Validate battery restriction, load loss, PV changes and communication faults, logging requests, output and bus state. Protection and performance acceptance require measurements. An animated diagram is not evidence of dynamic response.

Related VGRID product documentation

[LEONA-M200K](/en/product/leona-m200k)

[LEONA-H135K](/en/product/leona-h135k)

[Submit a project assessment for engineering review of actual conditions](/en/blog/category/guides#assessment-form)

Continue this series

[Communication acceptance for 400 V microgrids: PCS, MPPT, BMS and EMS](/en/blog/400v-pcs-mppt-bms-ems-communication)

[Split or integrated at 400 V: comparing H135K plus M200K with B750K](/en/blog/400v-split-h135k-m200k-versus-b750k)

References

Model descriptions follow the cited revisions; examples use the stated assumptions. Final configuration and test conditions need project confirmation. Site functions have not been independently verified here.

[LEONA-M200K · V1.5 · 2026-10-15 · PDF p.7](/uploads/2026/11/verified-specs/LEONA-M200K-spec-V1.5-20261015.pdf)

[LEONA-H135K · V1.0 · 2026-10-15 · PDF p.7](/uploads/2026/11/verified-specs/LEONA-H135K-spec-V1.0-20261015.pdf)

[Schneider Electric — Calculation rules when integrating solar and storage](https://www.electrical-installation.org/enwiki/Calculation_rules_when_integrating_solar_and_storage)

## What happens to surplus solar power when the battery is full and grid export is prohibited?

If loads, the battery and permitted export cannot absorb the surplus, generation must be curtailed under the approved control scheme rather than forced into the bus. Local loads, battery charging and approved utility export are separate outlets. Teaching assumptions: 100 kW available PV, 30 kW load and 20 kW allowed battery charging, ignoring losses. About 50 kW must be curtailed or received by another approved destination.

## Why can a battery limit charging before SOC reaches 100%?

Near a boundary or abnormal temperature, the battery may reduce allowed charging current. SOC below 100% does not establish full-rate absorption. Check real-time limits, DC-bus state and measured power rather than SOC alone.

## Can the generator be treated as a default surplus-PV sink?

A generator without approved regenerative capability is not a default PV sink. Coordinate export limitation, PV curtailment, generator loading and charging permission. Other absorption equipment also needs project design and is not assumed here.